PACKAGE 2

Large Diameter Utility Lines

Project Details

In order to meet water supply demand for a new Wastewater Treatment Plant in Georgetown, TX, Cash Construction was selected to construct a 60” polyurethane coated, cement lined steel pipe to meet their needs. The project involved installation and welding of approximately 5,700 LF of 60” steel pipe, 60” butterfly valves, 42” butterfly valves, and trenching underneath challenging Edwards Group karst limestone rock. The project challenges involved working in tight work areas with close proximity to vehicular traffic, but the team was able to overcome these challenges and execute to perfection. 

PROJECT HIGHLIGHTS:

 

  • 5,700 LF of 60” Welded Steel Water Main

  • 3 - 60” Butterfly Valves

  • 1 - 42” Butterfly Valves 

2023

Untitled design (6)_edited (1).png

Earthwork

external-pipeline-plumber-tools-itim2101-fill-itim2101-6_edited.png

Waterline

3653035_edited.png

Reclamation

Screen Shot 2023-08-29 at 9.45.53 PM.png

Keep Exploring?

CC.June2023.Package2-125.jpg
bottom of page