CITY OF ROUND ROCK
Infrastructure
Project Details
The City of Round Rock, TX has placed a high priority on developing and revitalizing its downtown area. Cash Construction was selected to construct three phases of this streetscape project. The project includes full street reconstruction, pedestrian facilities, water, sewer, electrical duct bank, and extensive drainage improvements.
PROJECT HIGHLIGHTS:
-
8,343 LF of Wet Utilities
-
1,888 LF of Box Culvert
-
9,842 SY of Subgrade
-
10,000 SY of Concrete Sidewalk
2021
![crosswalk_edited.png](https://static.wixstatic.com/media/f0cb18_536e40aa970d4ebbb65ab60e34d5c852~mv2.png/v1/fill/w_67,h_67,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/crosswalk_edited.png)
Pedestrian Facilities
![Untitled design (1) (1) (1).png](https://static.wixstatic.com/media/f0cb18_c2cf6dd33c664e699aea986ff27a5764~mv2.png/v1/fill/w_140,h_140,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/Untitled%20design%20(1)%20(1)%20(1).png)
Utilities
![icons8-road-96_edited_edited.png](https://static.wixstatic.com/media/f0cb18_8255d9d382c14566afee6f04e8d3d9ef~mv2.png/v1/fill/w_67,h_67,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/icons8-road-96_edited_edited.png)
Roads
![Screen Shot 2022-02-04 at 11.47.57 AM.png](https://static.wixstatic.com/media/f0cb18_678fdd851520440da684729babd084f7~mv2.png/v1/fill/w_980,h_221,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/f0cb18_678fdd851520440da684729babd084f7~mv2.png)
![Cash Construction - June 2021 - City of Round Rock-12_edited.jpg](https://static.wixstatic.com/media/f0cb18_edfa99e2fb5f460c8f71ba285d6afeb5~mv2.jpg/v1/fill/w_783,h_452,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/f0cb18_edfa99e2fb5f460c8f71ba285d6afeb5~mv2.jpg)
bottom of page