top of page
Screen Shot 2022-02-04 at 11.59.39 AM.png

WEISS LANE

Heavy Civil

Project Details

With more than 9,000 people driving on Weiss Lane every day, and the addition of a new High School campus, this expansion was an investment in safety and solved a much needed capacity issue for the community. Cash was selected to complete this three mile reconstruction, which included road widening from two lanes to four lanes with center turn lanes, curb, sidewalks, intersection signalization, water upgrades and drainage facilities. Additionally, this project included the replacement of two bridges.

PROJECT HIGHLIGHTS:

 

  • 12,000 LF Water Main

  • 15,000 LF Storm Pipe

  • 2 Bridges

  • Signalized Intersections

  • 38,000 Tons of HMAC Paving

2019

bridge_edited.png

Bridges

Untitled design (1) (1) (1).png

Utilities

icons8-road-96_edited_edited.png

Roads

Screen Shot 2022-02-04 at 12.38.15 PM.png

Keep Exploring?

WC-150.jpg
bottom of page